JR Construction & Consultant, Inc.
Florida contractor license CGC1514279 in Miami, Miami-Dade County, from the Florida Department of Business and Professional Regulation. Certified General Contractor, licensed since September 2007.
Check the live record on myfloridalicense.comJSONCopied on . Swapwire is not the state and not the contractor. This is a copy of public records taken on the date shown.
What the agency record says
Is the license active?
Yes. Florida Department of Business and Professional Regulation lists this license as "Current, Active" as of November 24, 2026. It expires August 31, 2028.
Any discipline, complaints or citations?
2 records on file. A complaint is an allegation unless its outcome says otherwise. The records
Have they pulled permits?
Yes. 467 in Miami-Dade County, FL since November 24, 2021. 68 in Miami, FL since November 24, 2021. Permit details
What work does the license cover?
General building and home improvement. License type: Certified General Contractor (CGC). First issued September 26, 2007.
In one paragraph
As of November 24, 2026, the Florida Department of Business and Professional Regulation lists license CGC1514279, held by JR Construction & Consultant, Inc. (business city: Miami), as "Current, Active": Certified General Contractor, 535 permits in Miami-Dade County and Miami, latest November 6, 2026 and 2 discipline, complaint or citation records. The license was first issued on September 26, 2007.
Written to be quoted. Please link back to this page or the live agency record.
The record, field by field
- License number
- CGC1514279
- Agency
- Florida Department of Business and Professional Regulation
- Status
- Active. Florida Department of Business and Professional Regulation lists this license as "Current, Active" as of November 24, 2026.
- Business city
- Miami, Miami-Dade County
- License type
- Certified General Contractor (CGC)
- Trades
- General building and home improvement
- First issued
- September 26, 2007
- Expires
- August 31, 2028
- Permits
- 467 in Miami-Dade County, FL since November 24, 2021 (details below).
- Permits
- 68 in Miami, FL since November 24, 2021 (details below).
- Records on file
- 2 discipline, complaint or citation records (listed below).
- Status effective
- 2007-09-26
Discipline, complaints and citations
| Date | Kind | What the record says | Outcome | Amount |
|---|---|---|---|---|
| Citation | Licensed Activity complaint, citation filed (violation code RG02) | Citation | ||
| Citation | Licensed Activity complaint, citation filed (violation code RG02) | Citation |
Records are copied from the agencies' public files. A complaint is an allegation unless its outcome says otherwise. Records matched by business name rather than license number can belong to a different business with the same name.
Permits in Miami-Dade County, FL
Miami-Dade County Department of Regulatory and Economic Resources lists this business as the contractor on 467 permits issued since November 24, 2021, the most recent on November 6, 2026.
- 467 building permits: 86 completed, 381 no status listed.
Most common work: roof (4), kitchen or bath (3), air conditioning (1).
| Issued | Permit | Work | Outcome |
|---|---|---|---|
| 2026-08-26 | building | roof | no status listed |
Miami-Dade County publishes no permit status or expiry. A permit counts as completed only when a certificate of occupancy or completion was issued; every other outcome is unknown (not open), and no expired share is given. A permit can expire for reasons outside the contractor's control, and the city's records do not say why. Matched by state license number on the permit, confirmed by the business name. Addresses and permit descriptions are left out because they can identify homes. Sources: miamidade-permits.
Permits in Miami, FL
City of Miami Building Department lists this business as the contractor on 68 permits issued since November 24, 2021, the most recent on June 15, 2026.
- 61 building permits: 50 completed, 5 expired before a final inspection, 1 cancelled or withdrawn, 5 still open. Of the 55 that have closed, 9% expired without a final inspection. Completed permits took a median of 131 days.
- 7 plumbing permits: 5 completed, 1 expired before a final inspection, 1 still open.
Most common work: wiring and lighting (11), kitchen or bath (2).
| Issued | Permit | Work | Outcome |
|---|---|---|---|
| 2026-04-23 | building | wiring and lighting | completed |
| 2025-12-22 | building | wiring and lighting | completed |
| 2025-07-10 | building | kitchen or bath | completed |
| 2025-02-25 | building | wiring and lighting | completed |
| 2024-11-29 | building | wiring and lighting | completed |
The City of Miami lists the permit company by name only; outcomes are from the permit's final flag and status (Final, Expired, Revoked, Active, Hold). A permit can expire for reasons outside the contractor's control, and the city's records do not say why. Matched by exact business name. Addresses and permit descriptions are left out because they can identify homes. Sources: miami-city-permits.
What this record does not show
These files do not show work quality, reviews or prices. Agencies publish different things: a record with no complaints listed here may still have complaints the agency does not publish in bulk. The city on file is the business address, so the contractor may work elsewhere.
Sources
- Florida DBPR construction licensee extract, copied 2026-11-24
- Florida CILB contractor discipline and Recovery Fund reports, copied 2026-11-24