Green Planet Electric Inc.
Florida contractor license EC13004768 in Palmetto Bay, Miami-Dade County, from the Florida Department of Business and Professional Regulation. Electrical Contractor, licensed since May 2011.
Check the live record on myfloridalicense.comJSONCopied on . Swapwire is not the state and not the contractor. This is a copy of public records taken on the date shown.
What the agency record says
Is the license active?
Yes. Florida Department of Business and Professional Regulation lists this license as "Current, Active" as of November 22, 2026. It expires August 31, 2028.
Any discipline, complaints or citations?
None in the files copied. Agencies do not all publish discipline in bulk, so check the live record too.
Have they pulled permits?
Yes. 102 in Miami-Dade County, FL since November 23, 2021. 29 in Miami, FL since November 23, 2021. Permit details
What work does the license cover?
Electrical. License type: Electrical Contractor (EC). First issued May 24, 2011.
In one paragraph
As of November 22, 2026, the Florida Department of Business and Professional Regulation lists license EC13004768, held by Green Planet Electric Inc. (business city: Palmetto Bay), as "Current, Active": Electrical Contractor, 131 permits in Miami-Dade County and Miami, latest November 2, 2026 and no discipline, complaint or citation records in the files copied. The license was first issued on May 24, 2011. Agencies do not all publish discipline in bulk, so check the live record too.
Written to be quoted. Please link back to this page or the live agency record.
The record, field by field
- License number
- EC13004768
- Agency
- Florida Department of Business and Professional Regulation
- Status
- Active. Florida Department of Business and Professional Regulation lists this license as "Current, Active" as of November 22, 2026.
- Business city
- Palmetto Bay, Miami-Dade County
- License type
- Electrical Contractor (EC)
- Trades
- Electrical
- First issued
- May 24, 2011
- Expires
- August 31, 2028
- Permits
- 102 in Miami-Dade County, FL since November 23, 2021 (details below).
- Permits
- 29 in Miami, FL since November 23, 2021 (details below).
- Status effective
- 2020-09-01
Permits in Miami-Dade County, FL
Miami-Dade County Department of Regulatory and Economic Resources lists this business as the contractor on 102 permits issued since November 23, 2021, the most recent on November 2, 2026.
- 102 electrical permits: 102 no status listed.
Most common work: electrical panel or service (7), solar or battery (6), wiring and lighting (4), air conditioning (2), kitchen or bath (2).
| Job | This contractor | All Miami-Dade County, FL permits |
|---|---|---|
| Rooftop solar | $37,100 median of 6 | $40,100 median of 6,660 |
The job value declared on the permit form: the applicant's estimate, not a paid price. Both columns use the same filter (residential permits for that one job with a value in the city's usual range). Typical values in Miami-Dade County, FL.
| Issued | Permit | Work | Outcome |
|---|---|---|---|
| 2026-10-02 | electrical | wiring and lighting | no status listed |
| 2026-08-12 | electrical | air conditioning | no status listed |
| 2026-07-28 | electrical | solar or battery | no status listed |
| 2026-07-01 | electrical | wiring and lighting | no status listed |
| 2025-12-22 | electrical | solar or battery | no status listed |
Miami-Dade County publishes no permit status or expiry. A permit counts as completed only when a certificate of occupancy or completion was issued; every other outcome is unknown (not open), and no expired share is given. A permit can expire for reasons outside the contractor's control, and the city's records do not say why. Matched by state license number on the permit, confirmed by the business name. Addresses and permit descriptions are left out because they can identify homes. Sources: miamidade-permits.
Permits in Miami, FL
City of Miami Building Department lists this business as the contractor on 29 permits issued since November 23, 2021, the most recent on March 3, 2026.
- 29 electrical permits: 28 completed, 1 expired before a final inspection. Of the 29 that have closed, 3% expired without a final inspection. Completed permits took a median of 134 days.
Most common work: wiring and lighting (8), water heater (2), air conditioning (2), electrical panel or service (2).
| Job | This contractor | All Miami, FL permits |
|---|---|---|
| Rooftop solar | $37,100 median of 6 | $40,100 median of 6,660 |
The job value declared on the permit form: the applicant's estimate, not a paid price. Both columns use the same filter (residential permits for that one job with a value in the city's usual range). Typical values in Miami, FL.
| Issued | Permit | Work | Outcome |
|---|---|---|---|
| 2025-11-07 | electrical | water heater | completed |
| 2025-03-04 | electrical | wiring and lighting | completed |
| 2024-12-27 | electrical | wiring and lighting | completed |
| 2024-03-27 | electrical | wiring and lighting | completed |
| 2024-01-24 | electrical | air conditioning | completed |
The City of Miami lists the permit company by name only; outcomes are from the permit's final flag and status (Final, Expired, Revoked, Active, Hold). A permit can expire for reasons outside the contractor's control, and the city's records do not say why. Matched by exact business name. Addresses and permit descriptions are left out because they can identify homes. Sources: miami-city-permits.
What this record does not show
These files do not show work quality, reviews or prices. Agencies publish different things: a record with no complaints listed here may still have complaints the agency does not publish in bulk. The city on file is the business address, so the contractor may work elsewhere.
Sources
- Florida DBPR electrical contractor licensee extract, copied 2026-11-22