Swapwire

Contractor rules in California: deposits, licenses and permits

On a California home improvement or swimming pool contract the down payment can be no more than $1,000 or 10% of the contract price (excluding finance charges), whichever is less. Asking for 50% up front, or any deposit above that limit, is not allowed. A CSLB license is required for any job of $1,000 or more in labor and materials combined, and for any job of any size that needs a building permit or where the worker uses employees.

Down payment limit

On a California home improvement or swimming pool contract the down payment can be no more than $1,000 or 10% of the contract price (excluding finance charges), whichever is less. Asking for 50% up front, or any deposit above that limit, is not allowed.

Conditions

Exceptions

Sources:

Checked .

When a license is required

A CSLB license is required for any job of $1,000 or more in labor and materials combined, and for any job of any size that needs a building permit or where the worker uses employees.

Conditions

Exceptions

Sources:

Checked .

What a handyman may do

An unlicensed handyman may do a job only if the total (labor and materials) is under $1,000, the work needs no permit of any kind, and they work alone with no employees. Electrical, plumbing or HVAC work that needs a permit needs a licensed contractor (C-10, C-36 or C-20), whatever the price.

Conditions

Exceptions

Sources:

Checked .

Permits for common jobs

Permits are issued by the city or county building department, not the state. CSLB says most jurisdictions require a permit for heating and air-conditioning work and for installing water heaters, and the state energy code says installing a heating or cooling appliance (other than a plug-in room unit) requires a building permit. Fences, decks, roofs, panels and remodels: check the city.

Conditions

Statewide, by job

San Francisco

Permits: PermitSF portal (DBI)

Water heater and furnace are not named on the fetched sf.gov pages; plumbing and mechanical permits without plans are applied for in PermitSF. Contractors must register with the City before applying for OTC permits.

Los Angeles

Permits: PermitLA Express Permit Online (LADBS)

LADBS (now dbs.lacity.gov) says simple projects not needing plan check are issued as Express Permits (https://dbs.lacity.gov/services/plan-review-permitting/plan-check-permit/express-permits); the qualification list is in a separate PDF Swapwire could not read. Job-level rules for water heater, HVAC, roof, panel, fence, deck and bathroom not verified on a fetched LADBS page; call 3-1-1.

San Diego County (unincorporated)

Permits: County PDS Building Division (online portal link not verified)

Exemptions do not authorize code violations, and separate electrical, plumbing and mechanical permits may still be required. Roof, HVAC and panel rules not captured.

Oakland

Permits: Oakland Online Permit Center (Accela)

Roof, furnace and panel not addressed on the Oakland pages fetched. MEP permits are each separate permits.

Berkeley

Permits: Berkeley Permits Online (Accela)

Permit Service Center (510) 981-7500, permits@berkeleyca.gov.

Sources:

Checked .

Who can pull permits

A licensed contractor, or the owner as an owner-builder. An owner-builder doing home improvements must have lived in the home as their main residence for the 12 months before the work is finished, do the work before selling, and use the exemption on no more than two structures in three years.

Conditions

Exceptions

Sources:

Checked .

Bonds and insurance

Every active California license must have a $25,000 contractor's bond (or cash deposit) on file. Workers' compensation insurance is required for any contractor with employees, and C-8, C-20 (HVAC), C-22, C-39 (roofing) and C-61/D-49 tree service contractors must carry it even with no employees. General liability insurance is required only of LLC licensees.

Conditions

Sources:

Checked .

Contracts and your right to cancel

Any home improvement job over $500 (labor and materials) needs a written contract with the price, a payment schedule, the down payment limit, who pulls permits, start and end dates, the license number, a mechanics lien warning and a notice of cancellation. You can cancel within 3 business days (5 if you are 65 or older); since 2026 the contract must give an email address and phone number for cancelling.

Conditions

Exceptions

Sources:

Checked .

Check a license

Look up the license number on CSLB's Instant License Check: status, classifications, bond, workers' comp and public complaint disclosures.

Sources:

Checked .

More

Common questions

How much can a contractor ask up front in California?

On a California home improvement or swimming pool contract the down payment can be no more than $1,000 or 10% of the contract price (excluding finance charges), whichever is less. Asking for 50% up front, or any deposit above that limit, is not allowed.

When does a contractor need a license in California?

A CSLB license is required for any job of $1,000 or more in labor and materials combined, and for any job of any size that needs a building permit or where the worker uses employees.

Can a handyman work without a license in California?

An unlicensed handyman may do a job only if the total (labor and materials) is under $1,000, the work needs no permit of any kind, and they work alone with no employees. Electrical, plumbing or HVAC work that needs a permit needs a licensed contractor (C-10, C-36 or C-20), whatever the price.

Do I need a permit in California?

Permits are issued by the city or county building department, not the state. CSLB says most jurisdictions require a permit for heating and air-conditioning work and for installing water heaters, and the state energy code says installing a heating or cooling appliance (other than a plug-in room unit) requires a building permit. Fences, decks, roofs, panels and remodels: check the city.

Can a homeowner pull their own permit in California?

A licensed contractor, or the owner as an owner-builder. An owner-builder doing home improvements must have lived in the home as their main residence for the 12 months before the work is finished, do the work before selling, and use the exemption on no more than two structures in three years.

What bond and insurance must a California contractor carry?

Every active California license must have a $25,000 contractor's bond (or cash deposit) on file. Workers' compensation insurance is required for any contractor with employees, and C-8, C-20 (HVAC), C-22, C-39 (roofing) and C-61/D-49 tree service contractors must carry it even with no employees. General liability insurance is required only of LLC licensees.

What must a home improvement contract include in California?

Any home improvement job over $500 (labor and materials) needs a written contract with the price, a payment schedule, the down payment limit, who pulls permits, start and end dates, the license number, a mechanics lien warning and a notice of cancellation. You can cancel within 3 business days (5 if you are 65 or older); since 2026 the contract must give an email address and phone number for cancelling.

Where do I check a contractor license in California?

Look up the license number on CSLB's Instant License Check: status, classifications, bond, workers' comp and public complaint disclosures.

Sources

Last reviewed ; data as of . General information, not legal advice. Rules change: the licensing agency has the final word.