A Massachusetts home improvement contractor may not take an advance deposit larger than the greater of one-third of the total price or the actual cost of special-order or custom materials that must be ordered in advance. Massachusetts requires state registration (not a license) as a Home Improvement Contractor for residential contracting on existing owner-occupied buildings of one to four units. Contractors on a single project under $500, part-timers earning under $5,000 in the prior 12 months, and licensed electricians and plumbers working in their trade are exempt.

- [Down payment limit](#deposit-limit)
- [When a license is required](#license-threshold)
- [What a handyman may do](#handyman-exemption)
- [Permits for common jobs](#permit-needed)
- [Who can pull permits](#who-can-pull-permits)
- [Bonds and insurance](#bond-and-insurance-requirements)
- [Contracts and your right to cancel](#contract-requirements)
- [Check a license](#license-lookup)

## Down payment limit

A Massachusetts home improvement contractor may not take an advance deposit larger than the greater of one-third of the total price or the actual cost of special-order or custom materials that must be ordered in advance.

- Max deposit: 33.30%

**Conditions**

- Applies to residential contracts over $1,000 on existing owner-occupied buildings with one to four dwelling units.
- No final payment can be demanded until the work is completed to the parties' satisfaction.

**Exceptions**

- Special-order or custom materials or equipment ordered in advance may be paid at actual cost even if above one-third.

Sources:

- [M.G.L. c. 142A, s. 2](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section2)

Checked November 22, 2026.

## When a license is required

Massachusetts requires state registration (not a license) as a Home Improvement Contractor for residential contracting on existing owner-occupied buildings of one to four units. Contractors on a single project under $500, part-timers earning under $5,000 in the prior 12 months, and licensed electricians and plumbers working in their trade are exempt.

- Single project exemption usd under: 500
- Part time exemption gross usd under: 5,000
- Max units: 4

**Conditions**

- Registration is with OCABR; a contract over $1,000 must be written and show the registration number.

**Exceptions**

- Owners doing their own work, and contractors working exclusively in landscaping, interior painting or wall covering, finished floor covering, fencing or freestanding masonry walls, above-ground pools, shutters or awnings, ground-level patios, or asphalt and driveways.

Sources:

- [M.G.L. c. 142A, s. 9](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section9)
- [M.G.L. c. 142A, s. 14](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section14)
- [M.G.L. c. 142A, s. 1](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section1)

Checked November 22, 2026.

## What a handyman may do

A handyman working on one project under $500, or part-time with under $5,000 in gross contracting revenue over the prior 12 months, need not register; neither do people doing only interior painting, floor covering, fencing, landscaping and similar listed limited trades. Licensed electricians and plumbers are exempt only within their licensed profession.

- Single project usd under: 500
- Part time gross revenue usd under: 5,000

**Conditions**

- The $500 exemption does not apply if a job is split to avoid the law.

**Exceptions**

- Statute text on licensing of electricians and plumbers themselves (c. 141, c. 142) was not read.

Sources:

- [M.G.L. c. 142A, s. 14](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section14)

Checked November 22, 2026.

## Permits for common jobs

Permits are issued by the city or town building department. For the two cities listed, a building permit is required to construct, alter, repair or demolish a structure, ordinary repairs such as painting and tiling are exempt, and electrical, plumbing and gas permits must be pulled by a licensed electrician or plumber. The statewide 780 CMR code text could not be read, so no state per-job list is given.

**Conditions**

- A contractor must tell you what permits are needed and that the contractor will get them; homeowners who get their own permits are excluded from the guaranty fund.

### Cambridge

Permits: [Cambridge Inspectional Services: Frequently Asked Questions](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)

Building permits are also issued to homeowners doing work on one- or two-unit dwellings where they live or plan to live. Sheds under 120 sq ft need no building permit. Phone 617-349-6100.

- **Water heater replacement**: Electric, plumbing and gas permits are issued only to Massachusetts licensed plumbers, gasfitters or electricians; the page does not say whether a water heater swap needs one. [\[source\]](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)
- **Furnace, AC or heat pump replacement**: Not stated on the page; trade permits are issued only to licensed tradespeople, so call ISD at 617-349-6100. [\[source\]](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)
- **Roof replacement**: The page says only that re-roofing may leave one existing layer; it does not say whether a permit is needed. [\[source\]](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)
- **Deck**: The page says a deck over 30 inches above grade needs a guardrail; it states no deck permit rule, but anyone who wants to construct or alter a structure must first get a building permit. [\[source\]](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)

### Somerville

Permits: [Somerville ISD permit portal (CitizenServe), linked from the ISD Building Division page](https://www.citizenserve.com/Portal/PortalController?Action=showHomePage&ctzPagePrefix=Portal_&installationID=149)

Homeowners of a 1- or 2-family home who live there may get a building permit; 3+ family or commercial buildings require a licensed contractor to apply. Roof, fence, deck and HVAC rules are not on the page; call ISD at 617-625-6600 ext. 5600 or isd@somervillema.gov. ISD page: https://www.somervillema.gov/departments/isd/building-division

- **Electrical panel replacement**: A licensed electrician must apply for and obtain all electrical permits. [\[source\]](https://www.somervillema.gov/departments/isd/building-division)
- **Water heater replacement**: A licensed plumber must apply for and obtain all gas and plumbing permits; the page does not name water heaters. [\[source\]](https://www.somervillema.gov/departments/isd/building-division)
- **Bathroom remodel**: Interior work needs a building permit except painting, tiling and flooring; interior gutting needs a building permit, not a demolition permit. [\[source\]](https://www.somervillema.gov/departments/isd/building-division)

Sources:

- [Cambridge ISD FAQ](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)
- [Somerville ISD Building Division](https://www.somervillema.gov/departments/isd/building-division)
- [M.G.L. c. 142A, s. 2](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section2)

Checked November 22, 2026.

## Who can pull permits

Homeowners can get a building permit for the one- or two-unit home where they live in both Cambridge and Somerville (3+ units need a licensed contractor in Somerville). Electrical, plumbing and gas permits must be pulled by a licensed electrician, plumber or gasfitter. A homeowner who pulls their own permit is excluded from the state home improvement guaranty fund.

**Conditions**

- Homeowner must live (or plan to live) in the one- or two-unit home.

Sources:

- [Cambridge ISD FAQ](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)
- [Somerville ISD Building Division](https://www.somervillema.gov/departments/isd/building-division)
- [M.G.L. c. 142A, s. 2](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section2)

Checked November 22, 2026.

## Bonds and insurance (not verified)

Not verified. Check with Massachusetts OCABR Home Improvement Contractor Program. M.G.L. c. 142A, s. 9 (registration) was read and does not mention insurance or a bond; the guaranty fund (s. 7) pays owners up to $25,000 per claimant after a judgment or award, but that is not a bond.

Sources:

- [Massachusetts OCABR Home Improvement Contractor Program](https://www.mass.gov/orgs/office-of-consumer-affairs-and-business-regulation)

Checked November 22, 2026.

## Contracts and your right to cancel

A residential contract over $1,000 must be in writing, signed by all parties, with start and completion dates, a detailed description of the work and materials, the total price, a payment schedule and the contractor's registration number. It must include the owner's three-day right to cancel and the bold warning 'Do not sign this contract if there are any blank spaces.'

- Written contract over: $1,000
- Cancel: 3 days

**Conditions**

- Notices required: registration, three-day cancellation rights, warranties, the 'blank spaces' warning in at least 10-point bold above the signature line, and any lien on the residence.
- The owner must get a fully signed copy at signing, and work cannot begin before that.
- The contract must disclose needed permits and that the contractor must obtain them.

**Exceptions**

- A contract that misses these requirements is not automatically invalid. The cancellation period itself is set by the 'applicable statute' the contract must cite, which was not read.

Sources:

- [M.G.L. c. 142A, s. 2](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section2)

Checked November 22, 2026.

## Check a license (not verified)

Not verified. Check with Massachusetts OCABR Home Improvement Contractor Program. The mass.gov pages blocked automated access, so the lookup URL could not be confirmed.

Sources:

- [Massachusetts OCABR Home Improvement Contractor Program](https://www.mass.gov/orgs/office-of-consumer-affairs-and-business-regulation)

Checked November 22, 2026.

## More

- [How to check a contractor license in Massachusetts](https://swapwire.ai/guides/check-contractor-license-massachusetts/)
- [Problems with a contractor in Massachusetts: complaints, bonds and recovery](https://swapwire.ai/guides/contractor-problems-massachusetts/)
- The same rules as JSON: [/data/rules.json](https://swapwire.ai/data/rules.json), or the `get_rules` tool on the [Swapwire MCP server](https://swapwire.ai/connect/).

## Common questions

### How much can a contractor ask up front in Massachusetts?

A Massachusetts home improvement contractor may not take an advance deposit larger than the greater of one-third of the total price or the actual cost of special-order or custom materials that must be ordered in advance.

### When does a contractor need a license in Massachusetts?

Massachusetts requires state registration (not a license) as a Home Improvement Contractor for residential contracting on existing owner-occupied buildings of one to four units. Contractors on a single project under $500, part-timers earning under $5,000 in the prior 12 months, and licensed electricians and plumbers working in their trade are exempt.

### Can a handyman work without a license in Massachusetts?

A handyman working on one project under $500, or part-time with under $5,000 in gross contracting revenue over the prior 12 months, need not register; neither do people doing only interior painting, floor covering, fencing, landscaping and similar listed limited trades. Licensed electricians and plumbers are exempt only within their licensed profession.

### Do I need a permit in Massachusetts?

Permits are issued by the city or town building department. For the two cities listed, a building permit is required to construct, alter, repair or demolish a structure, ordinary repairs such as painting and tiling are exempt, and electrical, plumbing and gas permits must be pulled by a licensed electrician or plumber. The statewide 780 CMR code text could not be read, so no state per-job list is given.

### Can a homeowner pull their own permit in Massachusetts?

Homeowners can get a building permit for the one- or two-unit home where they live in both Cambridge and Somerville (3+ units need a licensed contractor in Somerville). Electrical, plumbing and gas permits must be pulled by a licensed electrician, plumber or gasfitter. A homeowner who pulls their own permit is excluded from the state home improvement guaranty fund.

### What must a home improvement contract include in Massachusetts?

A residential contract over $1,000 must be in writing, signed by all parties, with start and completion dates, a detailed description of the work and materials, the total price, a payment schedule and the contractor's registration number. It must include the owner's three-day right to cancel and the bold warning 'Do not sign this contract if there are any blank spaces.'

## Sources

- [M.G.L. c. 142A, s. 2](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section2)
- [M.G.L. c. 142A, s. 9](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section9)
- [M.G.L. c. 142A, s. 14](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section14)
- [M.G.L. c. 142A, s. 1](https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter142A/Section1)
- [Cambridge ISD FAQ](https://www.cambridgema.gov/inspection/buildingelectricplumbingpermits/frequentlyaskedquestions)
- [Somerville ISD Building Division](https://www.somervillema.gov/departments/isd/building-division)
- [Massachusetts OCABR Home Improvement Contractor Program](https://www.mass.gov/orgs/office-of-consumer-affairs-and-business-regulation)

Last reviewed November 19, 2026; data as of November 22, 2026. General information, not legal advice. Rules change: the licensing agency has the final word.