Washington's contractor registration law (RCW 18.27) sets no cap on deposits or down payments. L&I advises homeowners not to pay in full until the job is done. Washington requires contractors to register with L&I (there is no skills test), and it is illegal to advertise, bid or work as a contractor without registration. Electricians and plumbers are separately licensed by L&I.
- Down payment limit
- When a license is required
- What a handyman may do
- Permits for common jobs
- Who can pull permits
- Bonds and insurance
- Contracts and your right to cancel
- Check a license
Down payment limit
Washington's contractor registration law (RCW 18.27) sets no cap on deposits or down payments. L&I advises homeowners not to pay in full until the job is done.
Conditions
- The only related provision is the disclosure statement telling homeowners they may withhold a contractually defined percentage as retainage (RCW 18.27.114).
- L&I 'Hire Smart' tip: don't pay in full until the job gets done.
Exceptions
- Another statute outside RCW 18.27 could apply; Swapwire read chapter 18.27 only.
Sources:
Checked .
When a license is required
Yes. Washington requires contractors to register with L&I (there is no skills test), and it is illegal to advertise, bid or work as a contractor without registration. Electricians and plumbers are separately licensed by L&I.
- Small job exemption usd less than: 500
Conditions
- Contractors must register if they do any work that 'adds to or subtracts from real estate', consult on construction, or develop/flip residential property (L&I guide).
- Unregistered contracting is a gross misdemeanor; each day worked after a citation is a separate offense (RCW 18.27.020(2), (5)).
- Electrical contractors need an electrical contractor license (RCW 19.28.041).
Exceptions
- Not required to register for gutter cleaning, pruning or lawn care, window washing (L&I guide).
- Exempt: one project under $500 total, but not if part of a larger operation, split to evade, or if the person advertises as a contractor (RCW 18.27.090(9)).
- Owners working on their own property or personal residence are exempt (18.27.090(12)-(13)).
Sources:
- RCW 18.27.020
- RCW 18.27.090
- RCW 18.27.010 (in chapter 18.27)
- L&I guide: Hiring a Contractor, Remodeler, or Handyman
- RCW 19.28.041
Checked .
What a handyman may do
Washington has no separate exemption for handymen: a person doing any work that adds to or subtracts from real estate must be a registered contractor, except a single job under $500 total, and only if they do not advertise as a contractor. Electrical work needs an L&I electrical license or certification.
- Max job usd less than: 500
Conditions
- The $500 exemption is for one project, labor and materials combined (RCW 18.27.090(9)).
- Painters and landscapers are 'specialty' contractors who must still register and post a bond (L&I guide).
- Electrical: an electrical contractor license is required to advertise, bid or perform electrical work (RCW 19.28.041); a certified electrician or plumber is exempt from contractor registration only within their certification (18.27.090).
- Owner exemption for electrical: no license needed to do electrical work at your own residence (RCW 19.28.261), but not for a new building for rent/sale/lease or property offered for sale within 12 months.
Exceptions
- Advertising as a contractor removes the $500 exemption.
Sources:
Checked .
Permits for common jobs
In Washington, building permits are issued by cities and counties, and each sets its own list of exempt jobs. Electrical permits are required for most electrical work and are issued by L&I, except where a city runs its own electrical program.
Conditions
- L&I: an electrical permit is required for most electrical work, whether new or replacing an existing item; the person doing the work buys the permit and you cannot use a permit someone else bought.
- Like-in-kind replacement of circuit breakers, one household appliance, up to five switches/dimmers/receptacles and similar are listed as not needing an electrical permit.
- Where a city runs its own permits or the job is in Tacoma Power's area, buy the permit from them (L&I).
Exceptions
- Swapwire did not confirm the statewide building code text (RCW 19.27); see city entries.
Seattle
Permits: Seattle SDCI: Do You Need a Permit? (applications through the Seattle Services Portal)
SDCI blocks automated page fetches (HTTP 403) from the research tool; text was read with a plain HTTP client from the same URLs. The $6,000 and exemption lists are SDCI's 'usually' guidance; Seattle Residential Code R105.2 governs.
- Water heater replacement: Yes. Since the 2023 Seattle Electrical Code, replacing a water heater needs an electrical permit from SDCI (section 80.50(B)(4)). Plumbing and gas piping permits in Seattle come from Public Health - Seattle & King County, which requires a permit to install, relocate or change plumbing or gas piping and lets a homeowner get a permit to do their own plumbing; a hired plumber must be a registered contractor. Ask Public Health whether your tank swap also needs a plumbing permit. [source] [source]
- Furnace, AC or heat pump replacement: SDCI says you need a permit for any furnace replacement or alteration, and a refrigeration permit for any split-system heat pump, air conditioner, or job with refrigeration piping. A homeowner can get a furnace or mechanical permit; only licensed refrigeration contractors can get a refrigeration permit. [source]
- Roof replacement: SDCI lists a 'Re-Roof Permit' among permits it issues. Its page says that in detached one- and two-family houses you do not need a permit to replace existing roof sheathing or repair the roof only if you are not changing the building envelope and the work is as good as the existing structure. [source]
- Fence: Fences less than 8 feet high with no concrete or masonry elements higher than 6 feet usually don't need a permit in Seattle (unless in an environmentally critical area). [source]
- Deck: Platforms, walks and driveways less than 18 inches above grade and not over a basement or other building story need no permit; other decks are not on the exempt list. [source]
- Bathroom remodel: Minor repairs or alterations costing $6,000 or less in any 6-month period don't need a permit (fair market value of labor and parts, even if you do the work), but work on load-bearing supports, building envelope changes, or work that reduces egress, light, ventilation or fire resistance always does; installing kitchen cabinets and surface finishes are exempt. [source]
- Electrical panel replacement: SDCI says you need a permit for all electrical work with a few exceptions. A homeowner can pull an electrical permit if they do their own work; otherwise you must hire an electrical contractor. [source]
Bellevue
Permits: MyBuildingPermit.com Tip Sheet 00 (Bellevue is a member jurisdiction)
Tip Sheet is a joint document of MyBuildingPermit.com jurisdictions; permits not required in critical, shoreline, sensitive or wildland-urban areas should be confirmed with the city. Swapwire did not fetch bellevuewa.gov (its page returned 'not found').
- Water heater replacement: A permit is required to replace a water heater in Bellevue (marked as required on the Tip Sheet's water heater replacement column). [source]
- Electrical panel replacement: Bellevue is marked as requiring a permit for electrical circuits and services; the sheet notes electrical permits are regulated by Washington L&I. [source]
- Fence: Fences not over 8 feet high need no permit in Bellevue. [source]
- Roof replacement: Bellevue marks re-roof overlay (limited to 2 total layers) and re-roofing tear-off using the same roofing type with sheathing unaltered as not needing a permit. [source]
- Deck: Decks less than 30 inches above grade need no permit in Bellevue; decking replacement without changing structural members or removing guardrails is also listed as not needing one. [source]
- Bathroom remodel: Bathroom fixture replacements without plumbing line changes (sinks, toilets) need no permit, but tub and shower replacement does. [source]
Tacoma
Permits: City of Tacoma Residential Permits (applications via Accela Customer Access Portal)
Electrical work: the page refers to Tacoma Municipal Code Chapter 12.06A; L&I says in Tacoma Power's service area buy the electrical permit from them.
- Water heater replacement: Tacoma's residential permit page lists water heaters under its Plumbing permit type ('relocate, remove, or new'). It does not say whether a same-for-same replacement is covered; ask the city. [source]
- Furnace, AC or heat pump replacement: Tacoma's Mechanical permit covers relocating, removing or newly installing ventilation, duct work, dryer hookups, exhaust fans, heating and A/C units; replacing a minor part that does not alter approval of the equipment is exempt. [source]
- Roof replacement: Reroofing a single-family or duplex home needs no permit in Tacoma if the existing coverings are removed first, the new material is no more than 2.5 lb per sq ft, there are no framing changes, and the building is not unreinforced masonry. A roof overlay over one existing layer has its own ePermit. [source]
- Fence: Fences not over 7 feet high need no permit in Tacoma; fences over 7 feet do. [source]
- Deck: Decks up to 200 sq ft, no more than 30 inches above grade, not attached to a dwelling and not serving the required exit door need no permit in Tacoma; decks are otherwise listed under the Alteration permit. [source]
- Bathroom remodel: Tacoma lists toilets, showers and sinks under its Plumbing permit; painting, tiling, cabinets, counter tops and similar finish work are exempt, as is removing and reinstalling a water closet without replacing valves, pipes or fixtures. [source]
Sources:
Checked .
Who can pull permits
In Washington, whoever does the electrical work buys the electrical permit, so a homeowner can pull a permit for their own work on their own home but cannot use a permit a contractor bought, and a homeowner cannot buy a permit for someone they hired. Owners may do electrical work at their own residence without a license unless the property is for sale or rent.
- Owner sale window: 12 months
Conditions
- Owner electrical exemption does not apply to new buildings for rent, sale or lease or property offered for sale within 12 months after getting it (RCW 19.28.261).
- Seattle: a homeowner can apply for an electrical permit if they perform their own work; otherwise hire an electrical contractor. A homeowner can get a furnace or mechanical permit.
- Contractor registration: owners working on their own property or personal residence are exempt (RCW 18.27.090(12)-(13)).
Exceptions
- Exemption does not apply when the owner is contracting to sell, demolish or lease the property.
Sources:
- L&I: Electrical Permit Basics
- RCW 19.28.261
- RCW 18.27.090
- SDCI Electrical Permits FAQ
- SDCI Furnace & Refrigeration FAQ
Checked .
Bonds and insurance
A registered Washington general contractor must carry a $30,000 surety bond and a specialty contractor $15,000, plus liability insurance of $50,000 property damage, $100,000 per person and $200,000 for more than one person.
- General contractor bond: $30,000
- Specialty contractor bond: $15,000
- Property damage insurance: $50,000
- Injury one person insurance: $100,000
- Injury more than one person insurance: $200,000
Conditions
- Registered contractors also need a Washington business license and, if they have employees, workers' compensation through L&I (L&I guide).
- Insurance may instead be an assigned account of the same amounts (RCW 18.27.050).
Exceptions
- L&I's guide tells homeowners to ask to see the contractor's policy; some policies exclude work outside normal business.
Sources:
Checked .
Contracts and your right to cancel
For residential work on four or fewer units priced at $1,000 or more, a Washington contractor must give you a signed disclosure statement before starting work, or they cannot bring a lien claim. Door-to-door sales of $25 or more can also be cancelled under the federal Cooling-Off Rule within 3 business days.
- Disclosure threshold: $1,000
- Cancel days business: 3
- Cooling off threshold: $25
Conditions
- Disclosure statement (12-point type) must show registration number, bond amount and expiration date, warn the bond may not cover your claims, say you may withhold retainage, warn of lien risk if suppliers go unpaid, and say you may ask for lien releases (RCW 18.27.114).
- Contractor must tell the customer if the registration expires, is revoked or suspended before the contract ends, and keep the signed disclosure for 3 years.
- Advertising must show the contractor's current registration number (RCW 18.27.100(3)).
Exceptions
- RCW 18.27 contains no right to cancel; the federal rule is the cancellation right for at-home sales.
- Contracts between contractors and public contracts under ch. 39.04 RCW are excluded.
Sources:
Checked .
Check a license
Check a Washington contractor with L&I's Verify tool, which shows registration, bond, insurance, workers' comp account, safety citations and lawsuits against the bond.
Sources:
Checked .
More
- How to check a contractor license in Washington
- Problems with a contractor in Washington: complaints, bonds and recovery
- The same rules as JSON: /data/rules.json, or the
get_rulestool on the Swapwire MCP server.
Common questions
How much can a contractor ask up front in Washington?
Washington's contractor registration law (RCW 18.27) sets no cap on deposits or down payments. L&I advises homeowners not to pay in full until the job is done.
When does a contractor need a license in Washington?
Yes. Washington requires contractors to register with L&I (there is no skills test), and it is illegal to advertise, bid or work as a contractor without registration. Electricians and plumbers are separately licensed by L&I.
Can a handyman work without a license in Washington?
Washington has no separate exemption for handymen: a person doing any work that adds to or subtracts from real estate must be a registered contractor, except a single job under $500 total, and only if they do not advertise as a contractor. Electrical work needs an L&I electrical license or certification.
Do I need a permit in Washington?
In Washington, building permits are issued by cities and counties, and each sets its own list of exempt jobs. Electrical permits are required for most electrical work and are issued by L&I, except where a city runs its own electrical program.
Can a homeowner pull their own permit in Washington?
In Washington, whoever does the electrical work buys the electrical permit, so a homeowner can pull a permit for their own work on their own home but cannot use a permit a contractor bought, and a homeowner cannot buy a permit for someone they hired. Owners may do electrical work at their own residence without a license unless the property is for sale or rent.
What bond and insurance must a Washington contractor carry?
A registered Washington general contractor must carry a $30,000 surety bond and a specialty contractor $15,000, plus liability insurance of $50,000 property damage, $100,000 per person and $200,000 for more than one person.
What must a home improvement contract include in Washington?
For residential work on four or fewer units priced at $1,000 or more, a Washington contractor must give you a signed disclosure statement before starting work, or they cannot bring a lien claim. Door-to-door sales of $25 or more can also be cancelled under the federal Cooling-Off Rule within 3 business days.
Where do I check a contractor license in Washington?
Check a Washington contractor with L&I's Verify tool, which shows registration, bond, insurance, workers' comp account, safety citations and lawsuits against the bond.
Sources
- RCW 18.27
- RCW 18.27.114
- L&I: What You Should Know About Hiring a Contractor, Remodeler, or Handyman
- RCW 18.27.020
- RCW 18.27.090
- RCW 19.28.041
- RCW 19.28.261
- L&I: Electrical Permit Basics
- SDCI Electrical Permits FAQ
- SDCI Furnace & Refrigeration FAQ
- RCW 18.27.040